Johnson's rule gives optimal answer for what type of scheduling problems?

Respuesta :

Etta217
Etta217 Etta217
  • 06-11-2017
The answer is two-machine flow shop. The two-machine flow shop issue in which each activity is prepared through an in-house framework or outsourced to a subcontractor. A calendar is set up for the in-house employments, and execution is measured by the makespan.
Answer Link

Otras preguntas

_______ refers to a series of vertical zones with distinctive climate and vegetation regimes. A. Sedimentation B. Urban expanses C. Altitudinal zonation D.
When a number is decreased by 10% of itself, the result is 144.What is the number?
Three roads, A, B, and C, all run south to north. They each meet a highway that runs west to east. Road B is 2.3 km west of Road A. Road C is 3.9 km east of Ro
Use properties to find the sum or product 34+0+18+26
how are elements and compounds related
What a antonym for plot
Which of the following god or goddess does not match his or her role? A. Ares: god of the seas B. Hera: goddess of marriage C. Apollo: god of the sun, music, la
You are running a fuel economy study. One of the cars you find are mmiles on a blue. It can travel 29 1\2 miles on a1 1\4 gallons of gasoline.Another car is re
What did Europeans want from asia
What are three ways can individuals influence public policy?