A negative schedule variance means that it took lesser than planned to perform the work

Respuesta :

Greenleafable
Greenleafable Greenleafable
  • 27-04-2017
If this is a true or false question, then it is false that a negative schedule variance means that it took lesser than planned to perform the work. As a matter of fact, quite the opposite is true - this means that it took longer than it was planned to complete this work. If less time was necessary to do it, then it would be a positive schedule variance.
Answer Link

Otras preguntas

Which statement is inconsistent with the concept of isotopes of the same element? a. Isotopes have the same number of protons b. Isotopes have the same atomic n
If snow is falling at a rate of 1/4 inch every 30 minutes, how much snow will fall in 4 1/2 hours.
If snow is falling at a rate of 1/4 inch every 30 minutes, how much snow will fall in 4 1/2 hours.
how do conservationists make use of watersheds and eco zones? why is this important?
what was the largest and most decisive battle fought in indian territory
Volume , mass, and weight can be measured with balances, scales, and ?
what was the largest and most decisive battle fought in indian territory
What is the compound of the way someone will do your hair
If snow is falling at a rate of 1/4 inch every 30 minutes, how much snow will fall in 4 1/2 hours.
A number decreased by 4 is less than 14?