It took construction company 63 days to complete the buildings. how many weeks did it take ? 1 week = 7days

Respuesta :

violetblue
violetblue violetblue
  • 25-02-2017
so it took 9 weeks or 2 months and 1 week
Answer Link

Otras preguntas

if 19×x is 208 whats x?
How did geography influence the history and culture of Southeast Asia and of Korea? Illustrate your answer with examples.
z^2 -10z+24=0 Factor and solve
A coverslip should be slowly lowered from a 45° angle onto a slide in order to (1) prevent the slide from being scratched (2) stop the loss of water from
How do the mass media spread popular culture across the world?
Find a simplified formula for the volume of a cylinder that has a height of 3x and a radius of 2x. Show your work.
What have members of the European Union (EU) and countries of the North American Free Trade Agreement (NAFTA) both attempted to do? (1) reduce regional trad
What challenges did lena horne face
SAM now has 30ml of pop to share equally into glasses. he wants an axact, whole of mls in each. Work out the different ways he can share his pop. what fraction
SAM now has 30ml of pop to share equally into glasses. he wants an axact, whole of mls in each. Work out the different ways he can share his pop. what fraction