AlihaMadrid
AlihaMadrid AlihaMadrid
  • 22-11-2021
  • Physics
contestada

A 800N mountain climber scales a 140m cliff. How much work is done by the mountain climber?

Respuesta :

evgeniylevi
evgeniylevi evgeniylevi
  • 22-11-2021

Answer:

112 [kJ]

Explanation:

1) related formula is: A=F*S, where A - required work [J], F - force [N], S - distance [m].

2) according to the formula above: A=140*800=112000[J]=112 [kJ]

Answer Link

Otras preguntas

Why do you think water is often called the universal solvent?
What did wilson say was the answer to problems in latin america?
Addison brought 5 pounds of oranges and 7 pounds of cherries to make a fruit salad for a fund raiser. She wants to package an equal amount of fruit salad into e
A building that is 115 feet tall casts a shadow that is 190 feet long. determine the angle at which the rays of the sun hit the ground to the nearest degree.
Which two auto companies received help from the US government during the crisis of 2008?
Read the following passage from The True Confessions of Charlotte Doyle: Above my head the lantern swung grotesquely, the men’s possessions skittered about like
find two consecutive odd integers such that 36 more than the lesser is three times the greater
What happens when the temperature of an object increases? A. The object's particles move closer together. B. The object's particles stop moving. C. The number
Which of the following is a challenge faced by developing nations? A. Growing population B. Declining population C. Lack of effort D. Increase
PLSSSSSSSSSSSSSSSSS I AM BEGGING U THIS IS A HUGE PART OF MY GRADE!!