NOTKNOWING NOTKNOWING
  • 25-10-2021
  • Mathematics
contestada

How long would it take eight lumberjacks to chop down eight trees at the same rate?

Respuesta :

Gervy
Gervy Gervy
  • 25-10-2021

Answer:

4 hours

Step-by-step explanation:

It take them 1.5 h ÷ 0.5 h to chop down 1 tree, so it would take 0.5 h × 8 = 4 hours to chop down 8 trees

Answer Link

Otras preguntas

I Know Why The Caged Bird Sings.                                                               How does Marguerite's (Maya Angelou's) grandmother treat Mrs. Flo
what percent is $10,000 out of a 120.000
calculate the area of the triangle. 7m. by 4m. a.14m^2 b.18m^2 c.28m^2 d.56m^2
Why did labor change during the industrial revolution
When did the Louisiana and Oklahoma territories belong to Spain?
How are humans most affected by the altitude changes in the Andean countries? Choose all answers that are correct. a. People at higher elevations live in colder
Which statement about the Tokugawa shogunate is accurate? a. It was a dynasty established after the shogun defeated Kublai Khan, and it limited foreign trade i
Which of the following topics is too broad for a 10-minute speech? a. preparing for a career in interior design b. interior design tips for the college dorm c.
the smallest unit in physics is the Planet length.wr need to know constant (h) the speed of light (c) and Newton's Gravitational Constant ( G). Find the Planck
What is a gene in its simplest form?