t4k3n
t4k3n t4k3n
  • 23-06-2021
  • Mathematics
contestada

if 8 people do a job in 40 hours. How many people need to do the job in 32 hours?

Respuesta :

breadsticksandcheese
breadsticksandcheese breadsticksandcheese
  • 23-06-2021

Answer:

6 people

Step-by-step explanation:

8/40 = x/32

multiply both sides by 32: 8(32)/40 = x

x = 256/40

= 6.4

≈ 6

Answer Link

Otras preguntas

how to solve these questions?
Solve for a: 2a + 4 = 3a + 2
Imagine a situation in which the number of urea leak channels increased dramatically in the ascending limb of the loop of Henle. What could be one likely conseq
How would your study of early China have been different if you were studying 100 years ago?
list the six external parts of a computer system and identify which are output and which and which are input devices
jon eat 3/4 of a pizza how much pizza is left
What's 165% as a fraction and decimal
if an element has more than one ionic caves how was that piece of information represented in a chemical name?
how many atoms are present in 4.0 mol of sodium
1+4=5 2+5=12 3+6=21 8+11=