rl239085
rl239085 rl239085
  • 23-04-2021
  • Mathematics
contestada

Stevie can refinish a driveway in 4 hours. Ray can refinish the same driveway in 3 hours. Princess can refinish the same driveway in 2 hours. If all three work together, how long would it take them to refinish 5 driveways? Show all work

Respuesta :

Аноним Аноним
  • 23-04-2021

Answer: 45 because 4+3+2=9 and 9x5=45

Answer Link

Otras preguntas

Which of the following is a way to get full benefit of your schooling
What is the relationship between a base and a basic solution?
Why did President Johnson lose control of Reconstruction? A: He was removed from office after impeachment by Congress. B: White Democrats were able to win major
Because the car that has a terrible oil leak not only as a new battery for the van but also slows him down because he needs the Atwell after every hundred miles
Was there ever an attack on America during WW2 besides Pearl Harbor and the Balloon Bombs?
What is claim in science?
what is the simplest level at which life may exist
write down three fractions with different denominators that add up to make
I need help solving this problem
What role did a changing environment play in the way peoples and civilizations changed? A. Environmental changes forced people to migrate to other areas. B. Env