episshasosilemba episshasosilemba
  • 23-04-2021
  • Business
contestada

What is the first phase of the project process?


A. Monitoring


B. Pre-Planning


C. Implementation


D. Planning

Respuesta :

tif21076 tif21076
  • 06-05-2021

Answer:Pre-planning

Explanation:

Answer Link
zlskfrum zlskfrum
  • 06-05-2021

Answer:

Explanation:

Implementation and Monitoring are latter phases of a project.  Pre-planning goes before Planning so the answer is B.

Answer Link

Otras preguntas

What is the value of X in the isosceles trapezoid below?
A California Condor is approaching its nest with a large chunk of carrion in its beak. As it approaches, it makes an upward swoop, achieving a momentary upward
Later in my sophomore year, I went through a metamorphosis. ^ does that sound ok?like syntax wise
Answers n = 2 energy level to the n = 4 energy level has a __________ wavelength than the photon absorbed by an electron moving from the n = 2 to the n = 3 ener
What units are used for volume? A. g B. l C. L D. m
9,540,00 in expanded for in exponents
Which organism is responsible for cervical cancer? Marta is infected with a sexually transmitted disease. Diagnosis reveals that she is infected with the , whi
A flower store has 42 carnations and 21 pansies. It puts the same number of flowers in each of 7 bouquets. How many flowers are in each bouquet?
Mr. Jamison will stain the deck in his backyard. The deck has an area of 752.4 square feet. If the deck is 33 feet long, how wide is it? Justify your procedure.
Two cars with the same velocity must have the same speed. True or false ?