cooperdeagan
cooperdeagan cooperdeagan
  • 24-03-2021
  • Engineering
contestada

you push a 10 n object 10 m how much work was done on the object​

Respuesta :

ryanmv07 ryanmv07
  • 25-03-2021

Answer: the answer is

Work= Force * Distance

Work= 10N * 10m

Work= 100J

Explanation:

Answer Link
faisal4craft7 faisal4craft7
  • 25-03-2021
W = F D

W = 10N × 10 m

W = 100 N.m

W = 100 J
Answer Link

Otras preguntas

Solve the quadratic equation by completing the square. (Enter your answers as a comma-separated list.)x2 − 6x − 27 = 0
Which choice describes the translation represented by the translation rule (x,y) -->(x+4, y-1)?4 units to the right and 1 unit down1 unit to the right and 4
Has colored salts that will produce colored aqueous solutions a. F b. Li c. Fe d. He e. Si
Semicircle arc AB,AC,BD and CD divide the circle above in to regions. The points shown along the diameter AD divided in to 6 equal parts. If AD=6 what is the to
what is the average speed of a cheetah that runs 70m in 2.5 seconds?
Search engines enable you to:A. talk to people via the computer.B. locate Web pages related to a specific subject.C. connect to a better ISP.D. find and replace
what is a word phrase for the expression r-31
When a fixed amount of gas has its Kelvin temperature and pressure doubled, the new volume of the gas is a. Four times greater than its original volume b. Twi
In , QR = 4, RS = 15, and . In , VT = 8, TU = 32, and . Are the polygons similar? If they are, write a similarity statement and give the similarity ratio.
what is the average speed of a cheetah that runs 70m in 2.5 seconds?