J4k3H4M17T0N
J4k3H4M17T0N J4k3H4M17T0N
  • 25-10-2016
  • Physics
contestada

How much work is done on a 10N block that is lifted 5 meters off the ground by a pulley?

Respuesta :

iwishtobeanonymous
iwishtobeanonymous iwishtobeanonymous
  • 25-10-2016
50 joules. Hope this helps!
Answer Link

Otras preguntas

8 divided by 2 (2+2)
What is the Value of 3 to the second power divided by 3 to the 4th power?
For many years, scientists believed that almost all animal lineages burst into being during the Cambrian era (just after the end of the Precambrian super eon).
What is the starting point for measuring longitude
Suppose that X has an exponential distribution with a mean of 10. Determine the following: a. P(X < 5) b. P(X < 15 | X > 10) c. Compare the results in
Find the inverse function of y=1
On an international​ exam, students are asked to respond to a variety of background questions. For the 41 nations that participated in the​ exam, the correlatio
Class 10R sat a test. The mean mark for the class was 70%. There are 30 students in class 10R, 20 of whom are boys. The mean mark for the boys in the test was 6
What was a goal of southern whites in creating black codes?
how do people 45-60 get insurance?