katherineye2007
katherineye2007 katherineye2007
  • 24-07-2020
  • Mathematics
contestada

Mark can dig a ditch in 4 hours. Greg can dig the same ditch in 3 hours. How long would it take them to dig it together?

Respuesta :

StarVAng
StarVAng StarVAng
  • 24-07-2020

Answer:

1 hour and 43 minutes

Step-by-step explanation:

Add both of theyre work hours together you get 3/12 and 4/12

Then you add both 3/12 4/12

You get 7/12

They complete the job 12/7 hours =1 5/7 (1 hour 43minutes)

Answer Link
brynnxin brynnxin
  • 04-02-2022

Answer:

1 5/7

Step-by-step explanation:

Answer Link

Otras preguntas

What small northern state was the first to issue a call for black troops
1.Find the constant of variation for the relationship f(x)= 30x.  A.10  B.30  C.x  D.f(x)2.Find the constant of variation for the relationship shown in the foll
Write 5 lines about whether you prefer holidays at home or abroad?? Thankyou
what's the answer to v+9/3=8
What must occur before clouds can form?
What must occur before clouds can form?
Max is making a rectangular garden that is 5 feet less than twice it's width. If the perimeter of the garden is 89 feet, what will be it's dimensions?
how is nonverbal communication used in sports
how did the location of a farm in the southern colonies affect the kind of crops grown there
The school hall is 4 times as long as it is wide. If the perimeter is 55m, what is the length? and what is the width?