bezakarelle bezakarelle
  • 24-06-2020
  • Mathematics
contestada

if 8 people can pick the apples from the trees in 6 days, how long will it take 12 people

Respuesta :

mhanifa
mhanifa mhanifa
  • 24-06-2020

Answer:

4 days

Step-by-step explanation:

8 people can do the job in 6 days, job is this case is picking apples.

  • The amount of the job (apples) is same and the only variable is number of people which changes the time accordingly.  

1 person can do same job for 6*8= 48 days

12 people can do same for 48/12= 4 days

Answer Link

Otras preguntas

What is 700000 divide by 15
Both 2 and 5 are common factors of a number. The number is between 101 and 118. What is the number? Give a reason for your answer.
Find the speedExample:      396  miles in 6 hours
Keith and Michelle went out to dinner. The total cost of the meal, including the tip, came to $53.70. If the combined tip came out to $9.60, and each friend spe
Why can't water go through sand?
there are 7 gray kittens. 2 kittens are black. how many fewer black kittens are there than gray kittens?
What is one tenth of 80
A skateboarder shoots off a ramp with a velocity of 5.0 m/s, directed at an angle of 57° above the horizontal. The end of the ramp is 1.2 m above the ground.
what is the mathematical name for a diamond (quadrilateral)
What is four to the eighth power over four to the fifth power