aaliyahgbnl2002
aaliyahgbnl2002 aaliyahgbnl2002
  • 25-03-2020
  • Arts
contestada

What was the role of master builder?

Respuesta :

yusra33khatab
yusra33khatab yusra33khatab
  • 25-03-2020

Answer:

Master builders were responsible for the design, survey, engineering, and management of the construction. In other words, the head builder would be the architect, engineer, and superintendent for each project, Master builder project delivery system and designer construction knowledge

Answer Link

Otras preguntas

are kids under pressure at school yes or no
Use division to find all the whole number ratios equivalent to 168:56
In Edgar Allan Poe's "The Philosophy of Composition," which of these elements of the poem "The Raven" does Poe say he decided early on? A. The plot of the poem
which sentence correctly uses an adjectival phrase? A) We went to the store, and Kathryn selected a sweater. B) Kind, gentle, Kathryn selected a sweater. D) Kat
what does jefferson think is a greater danger in a republic than rebelling
Antwone earns money at a steady rate mowing lawns. The points (1,25) and (5,125) appear on a graph of the amount earned versus number of lawns mowed. What are t
what is habitat quality
Jessie's bus ride to school is less than 5 minutes more than 2/3 the time of Robert's bus ride. WRITE AN INEQUALITY
A line has a slope 5/6 and y intercept -3. which is the equation of the line?
Plz help me with seven eight and nine