kalpanathakulla680 kalpanathakulla680
  • 23-02-2020
  • Mathematics
contestada

30 men can do a piece of work in 40 days .how long it take to complete the work if 5 men were reduced​

Respuesta :

Аноним Аноним
  • 23-02-2020
30 men -> 40 days
1 man -> 1/1/3 days
30-5men = 25 men
25 men -> 1/1/3 x 25
= 33/1/3 days
Answer Link
tolaosunrinde
tolaosunrinde tolaosunrinde
  • 23-02-2020

Answer: 48 days

Step-by-step explanation:

If it takes 30men 40days to complete a task, 1 man takes 30×40= 1200 days

25 men will therefore take 1200/25= 48 days.

Answer Link

Otras preguntas

what is something we do on a typical day that involves energy tranformation? give an example of the description of one energy form transformong into another ene
Why did Columbus think he had reached Asia when he landed in the Americas? A. He miscalculated the size of the earth by more than half. B. The land looked like
60 points on the line! If you can do this paper! Only 2 questions!
why are highland regions considered a climate region
What is the best west to remember MOHs hardness scale
what is 360 in the ratio 1:8?
Another way to say "it is important to" without "is," "was," "were" verbs.
some soldiers in the early Roman army rode to the battlefield, dismounted, and then fought on foot. Did the later Roman army ever develop a cavalry?
Is it enough to be “suspected” of terrorism, or should theses suspects have the right to a fair trial being detained indefinitely?
Gravity is considered what type of force? conservative non-conservative