nooneybabygurl nooneybabygurl
  • 25-11-2019
  • Mathematics
contestada

Manny can complete a sales route in 7 hours. Jane can do the same job in 3hours. How long will it take them to the job together

Respuesta :

Lexielove451 Lexielove451
  • 27-11-2019

Answer:

Step-by-step explanation:

1/7x+1/3x=1

3/21x+7/21x=1

10/21x=1

x=21/10 hour or 2 hours and 1 minute

Answer Link

Otras preguntas

Find the sum of the vectors.u = (3, -1), v = (-2,-4)u+V =​
In ΔTRS, m∠T = 20 and the m∠R = 20. Which statement is TRUE about the sides of the triangle? A) TR > TS B) TR < TS C) TR < RS D) RS < TS
Where do cells like brain cells and muscle cells get their energy from? Where does it come from?
It takes stewart 8 minutes to drive to the store. It takes him 7 times as many minutes to Drive to work than it takes him to Drive to the store. How many minute
What are the third world countries geographically closest to the US?
BRAINLIEST IF CORRECT :) 3(2x−3)−5x=4 x =
Two balls are kicked with the same initial speeds. Ball A was kicked at the angle 20° above horizontal and ball B was kicked at the angle 75° above horizontal.
3x + 3(x + y) ? Help!
A satellite orbits the Earth every 2 hours at an average distance from the Earth's centre of 8000km. (i) What is the average angular velocity of the satellite a
You are walking along and find a fault in an outcrop of rocks. In looking at the fault, you notice that the footwall of the fault has been thrust upward in rela