Select the correct answer.
In which phase does the development team check the project for error handling capabilities?

A , design
B, testing and delivery
C, development
D, maintenance

Respuesta :

Аноним Аноним
  • 25-11-2019

Answer:

B

Explanation:

engineers design and carry out test cases and evaluate exit criteria (by following the scope set in the planning phase). They create bug reports describing detected defects and report to the stakeholders on the test findings and the completion status. Testing may be repeated to check for errors.

Answer Link

Otras preguntas

A radio station has a frequency of 90.9 megahertz (9.09 × 10^7 Hz). What is the wavelength of the radio waves the station emits from its radio tower?
is burrow a first or second accented syllable word
Identify the set as finite or infinite. {1,1/4 ,1/16 ,1/64 , . . .}A. FiniteB. InfiniteCan someone explain this one for me?
Our football team won 3/4 of the games that it played. It won 12 games. How many games did it play?
What is domain and range
In , QR = 4, RS = 15, and . In , VT = 8, TU = 32, and . Are the polygons similar? If they are, write a similarity statement and give the similarity ratio.
In order to determine speed, you must know a.time.c.Both (a) and (b)b.distance.d.None of the above
the length of a tennis court is 78 feet. this is 3 less than 3 times the width of the court. what is the width of the court
The movement of deep ocean currents is mainly caused by:?
Which of the following is NOT a function of proteins?   A. store and transmit genetic information    B. help to fight disease    C. control the rate of reaction