Cost center responsibility reports typically focus on the flexible budget variance.
a. True
b. False

Respuesta :

andriansp andriansp
  • 30-08-2018

That statement is true

Budget variance refers to the difference between the expected amount of the budget with the actual amount of the budget. The difference in budget variance tend to be influenced mostly by the number of externalities that arise during operation (such as natural disaster or accidents)

Answer Link

Otras preguntas

The canadian $1 coin has a diameter of 26.5 mm what's is the circumference of the coins use 3.14 for pi
What ideas made george washington carver famous??
HELP ME PLZZ FFFAAASSSTTTT One problem associated with getting a license suspension is: A. A permanent restriction will be placed on your license B. You will be
solve for r for the equation 1/3 pie r squared h
A vitamin jar contains a total weight of 60 milligrams of vitamin c how many vitamins are in the jar if each vitamin contains 1.5 milligrams of vitamin c
What is the function of a gene?
What did john wilkes booth say after he shot abraham lincoln?
When a story traces a man's journey out of north korea to south korea, across the ocean to los angeles, to san antonio and then to a seat next to the podium whe
Which sequence begins with 1 and follows this rule? multiply by 2 and add 1. a.1, 2, 6, 14, 30 b.1, 3, 7, 15, 31 c.1, 4, 6, 22, 46 d.1, 2, 10, 22, 46
did nclegoatty build the pyramid and the effiel tower and rosated hilter till get rabies