kawasiwilson6530 kawasiwilson6530
  • 22-07-2018
  • Social Studies
contestada

"personnel who need to take part in disaster recovery planning include:"

Respuesta :

kelseab1212
kelseab1212 kelseab1212
  • 23-07-2018
All IT/IS technical staff all the way up to CEO.
Answer Link

Otras preguntas

Write a system of equations to describe the situation below, solve using substitution, and fill in the blanks. Two students in the same Spanish class, Chloe and
Which of the following activities is most likely to improve muscular endurance? A. high jumping B. long distance running C. sprinting D. throwing a fast ball Pl
Please please help ASAP, question is order from largest at the top and smallest at the bottom: 1. 10hm 2. 100cm 3. .001mm 4. .01km
Which of the following statements is true based on what we know about the properties of utility? Group of answer choices Alexandra receives 20 utility from drin
Megan and noah were splitting nachos. Megan ate 1/4 of the nachos and noah ate 5/12 of the nachps. What fraction of the nachos did they eat
What is the main difference between project tasks and client support tickets?
Question 26 (5 points) Which resources are abundant in the Andean and midlatitude countries? Choose all answers that are correct. copper natural gas diamonds pe
Which of the following processes resulted from the growth of manufacturing during the industrial Revolution?A. Increase in public education B. Decrease in urban
Solve the quadratic equation below : 2x^2 + 12x =66
what is 12=0.5m pls i need help