When mrp ii systems include feedback to revise a plan that is not feasible, they are known as?

Respuesta :

LearnGrow
LearnGrow LearnGrow
  • 31-05-2018
MRP stands for Manufacturing Resource Planning.
When MRP II systems include feedback to revise a plan that is not feasible, they are known as closed loop MRP. The closed loop MRP includes products that have been returned by retail stores, or products that did not meet the manufacturer's quality control standards. 
It is used for production planning and inventory control.
Answer Link

Otras preguntas

where is atp synthesized in photosynthesis?
3k+10=2k-21 (2-step equation)
How does the story explain treys reason for running in the dark
fill in the blank with the correct indefinite article. (una/unas/un/unos).
Rearrange things so i can live this weekend
what are apartheid laws?​
Which inequality does this graph ms.Jennifer wants to have a graduation party that will cost at least $375. If Jennifer can save $52 a month, how many months wi
A Mercedes Benz with mass 1.8×10^3 kg is traveling east bound at +15.0 m/s, while a compact car with mass 9.00×10^2 kg is traveling west bound at -15.0 m/s. The
[ Brainliest ] Apply it! The measure of each central angle of a regular 10-sided polygon is ____ degrees.
Platinum has a mass of 107.25 g and a volume of 5 cm3. What is the density of platinum?