snowww34111 snowww34111
  • 26-04-2024
  • Business
contestada

Given a takt time of 8.7 minutes and net daily production of 440 minutes, what is the maximum daily demand that can be satisfied using this production process? (Round down your answer to a whole number.)

Respuesta :

Otras preguntas

PLEASE HELP ME Hawaii was surrendered to the U.S. after a _________.
how do you graph f(x)= |x-2|+5
65+23...Use rounding or compatible numbers to estimate the sumWhat is the answer?
what is 3,490,000 in scientific notation
an aircraft travels 2000 km from winnipeg to montreal in 3.2 hours and returns in 4 hours. if the wind speed is constant, find the wind speed and the speed of t
What is 1:3 and show how much lemon juice would be needed if you use 36 cups of water to make lemonade
4=(1/2)^× solve for x
What is 1:3 and show how much lemon juice would be needed if you use 36 cups of water to make lemonade
How do volvox get rid of waste/water?
What is a good strategy for finding the distance between two numbers on a number line?