kandigirl13091 kandigirl13091
  • 26-03-2024
  • Computers and Technology
contestada

When a team member is not sure of his tasks and comes to the project manager for clarity, he should be given the documents that have all the details of work packages. Which documents contain that information?
a) Project schedule
b) Work breakdown structure
c) Activity list
d) Risk management plan

Respuesta :

Otras preguntas

It takes 96 cubic in cubes to fill this figure (its a rectangle) 6 inches 2 inches 8 inches find the volume of the figure by multypiling the side lengths.What d
A 2 liter drink cost $0.15 per deciliter. How much does The drink cost
Which are a better investment, stocks or mutual funds?
under what conditions would a healthcare team have more than one physician?
solving for x: 15+8x=2x+7-5x
If the Latin root mandare means “to entrust,” what does commended mean insulted by trusted with worried over laughed at
Do you add water to acid or acid to water ?
Wind energy is plentiful in regions with vast, open spaces. It is a non-polluting, renewable resource. What could be an economic factor that makes the use of th
The sum of all the federal deficits over time is known as the
Help please thanksssss