tsimm6079 tsimm6079
  • 23-01-2024
  • Mathematics
contestada

Rajesh takes 10 days less than the time taken by Manish to finish a piece of work. If they together can finish the work in 12 days, find the time taken by Manish to finish the work.

Respuesta :

Otras preguntas

How many molecules are in 8.27 mol of SiH,?
What could happen if air gets caught in between the space between the lungs and thoracic cavity?
There are 4 times as many dogs as cats. If the total number of dogs and cats is 20, how many dogs are there?
plzzz help me what is 3[x -6]
An earthquake’s magnitude is a measure of the _____. damage the earthquake causes number of surface waves it produces amount of shaking it produces size of se
Underline the VERBS in the sentence. Are they past, present, or future? Newborn dolphins and whales have hair, but it falls out soon after birth.
Amelie has three dogs, Max, Jasmine, And Springer. She buys a bag of dog food that contains a special mix. Each dog gets a different amount of the food based of
where are secondary economic activities likes manufacturing most likey to be located
The group of companies centrally controlled to regulate production, reduce competition, and teduce production cost is called a Please help
Which is a TCS food?